Stage 2 & 3 - Redevelopment: Entry Foyer & Carpark


February 5, 2025

Something exciting is on the horizon for Pittwater…


Early plans are progressing for a transformational upgrade to the Club’s entry and parking experience, reflecting our long-term commitment to convenience, accessibility, and elevated member benefits.

While still subject to council approvals, this proposed enhancement represents one of the most significant changes ever undertaken at Pittwater.


Stage 2 & 3 further encompasses the repositioning of the club’s main entry and internal upgrades. A new foyer structure will be constructed, with circulation and stair connections reconfigured. The existing reception area will be removed to make way for a new museum layout, and internal finishes will be applied across ground and upper levels. Additionally, escalators will be installed on Level 1 to future-proof circulation in line with the club’s long-term master plan.


Finally, the under croft area will be revitalised to improve parking, circulation, and aesthetics. This includes excavation, a new ceiling system with specialist lighting, column cladding, and refreshed landscaping. These works collectively aim to modernise the member journey, ensuring improved accessibility and a seamless club entry experience.


We’ll be sharing more details as this vision unfolds.. stay tuned for updates on this exciting evolution at Pittwater.

FOYER OVERVIEW VIDEO WALK THROUGH:

EXTERNAL OVERVIEW OF THE CLUB VIDEO WALK THROUGH:

June 5, 2025
- Popular Beaches’ RSL club set for $7.5m facelift Planning authorities are set to decide on a $7.5m proposed refurbishment of a popular northern beaches’ RSL club. Read the full article and see the latest drawings..
May 5, 2025
Stage 1 Redevelopment: Access & Circulation Upgrades The Stage 1 redevelopment of Pittwater RSL is focused on transforming access, entry circulation, and overall functionality to enhance member and guest experience. Key early works involve the creation of a temporary entry point, including the construction of a compliant ramp, landscaping, and protective hoarding. This enables the commencement of major structural additions such as the new terrace stairway and the procurement of a lift. The basement level will house a new VIP lobby, lift shaft, and escalator pit, complemented by updated traffic controls and a security boom gate. From the basement to Level 1, a new vertical transport system will be constructed, although it will not yet connect to the Upper Ground Floor. Structural penetrations, hoardings, and reinstatement of finishes will be carried out across multiple levels to accommodate these upgrades. External enhancements are also critical in this stage. A new diesel hydrant pump will resolve fire pressure deficiencies, while a redesigned entry awning, façade improvements, and branded signage will significantly uplift the visual identity of the club. New perforated screening will be introduced in line with design approvals, and escalator procurement is under consideration pending board approval. This phase lays the groundwork for Stage 2 enhancements, while already delivering significant community, accessibility, and social benefits.