A Flexible New Function Space


April 5, 2025

ROMAS: Pittwater’s New Premier Event Space


The revitalisation of the former Bocado area is now complete! We are thrilled to introduce ROMAS, a dynamic, multi-purpose function venue within Pittwater RSL, ready to host your next memorable occasion.

This 280sqm space has been completely transformed to create a cohesive, contemporary, and flexible environment, designed to serve both our members and external guests. ROMAS is now available for bookings for a wide range of events—from social celebrations and family gatherings to private parties and corporate functions—all managed through Events by Pittwater.
The new design delivers on a vision to establish a high-utility, vibrant venue. Key features that enhance the space's versatility and appeal include:

  • Modular Furniture System: Easily configured to accommodate theatre-style presentations, cocktail receptions, and formal dining setups.
  • Modern Aesthetics: Completely new floor finishes, updated fascia cladding, and state-of-the-art feature lighting work together to create an elevated ambiance.

ROMAS is a brand NEW space; it is a stunning venue ready to unlock the full potential of your event.

Ready to book your event?
 

Contact Events by Pittwater today to enquire about availability and packages for ROMAS.

PROGRESS UPDATE

September 3rd, 2025


  • Lighting is complete
  • Sound/AV tech and aesthetics are in progress


PROGRESS UPDATE

August 26th, 2025



  • Programming all ceiling lights
  • Installation of stone
  • Final painting and patching of walls and ceilings
  • V groove panelling


PROGRESS UPDATE

August 25th, 2025


Works Completed

  • Installation of new lighting throughout the space
  • Installation of the new stone benchtop
  • Final adjustments to the glazing door
  • Installation of the automatic entry door

Planned Works for Next Week

  • Installation of the glass panel on the stone benchtop
  • Final painting touch-ups
  • Installation of temporary V-groove panelling


PROGRESS UPDATE

August 18th, 2025


  • All plastering and majority of painting works completed.
  • New aluminium and glazing doors installed.
  • New carpet tiles have been installed.
  • Electrical services roughed in with installation of new wall lights and pendant lights to be completed at weeks end.
  • Bar stone measured and ordered, preparing for installation.
  • New wall in Billiard room painted with TVs installed.
  • Joinery bench seating upholstery in production.


PROGRESS UPDATE

August 11th, 2025


  • Floor preparation complete for carpet tiles.
  • Fitting off wall lights.
  • Auto door and glazing installed.


PROGRESS UPDATE

August 7th, 2025


  • Painting underway.


PROGRESS UPDATE

August 4th, 2025


  • Completed framing, plaster setting and sanding.
  • Electrical roofing completed.
  • Painting commencing.


PROGRESS UPDATE

July 30th, 2025


  • Site establishment.
  • Electrical Isolation.
  • Electrical rough in for new light locations.
  • Wall framing.


Design proposal for the reimagined space..

June 5, 2025
- Popular Beaches’ RSL club set for $7.5m facelift Planning authorities are set to decide on a $7.5m proposed refurbishment of a popular northern beaches’ RSL club. Read the full article and see the latest drawings..
May 5, 2025
Stage 1 Redevelopment: Access & Circulation Upgrades The Stage 1 redevelopment of Pittwater RSL is focused on transforming access, entry circulation, and overall functionality to enhance member and guest experience. Key early works involve the creation of a temporary entry point, including the construction of a compliant ramp, landscaping, and protective hoarding. This enables the commencement of major structural additions such as the new terrace stairway and the procurement of a lift. The basement level will house a new VIP lobby, lift shaft, and escalator pit, complemented by updated traffic controls and a security boom gate. From the basement to Level 1, a new vertical transport system will be constructed, although it will not yet connect to the Upper Ground Floor. Structural penetrations, hoardings, and reinstatement of finishes will be carried out across multiple levels to accommodate these upgrades. External enhancements are also critical in this stage. A new diesel hydrant pump will resolve fire pressure deficiencies, while a redesigned entry awning, façade improvements, and branded signage will significantly uplift the visual identity of the club. New perforated screening will be introduced in line with design approvals, and escalator procurement is under consideration pending board approval. This phase lays the groundwork for Stage 2 enhancements, while already delivering significant community, accessibility, and social benefits.